Case Studies - Energy/Utility
- Drill Pipe Market Study
- Scope: The Client wanted to better understand the use of drill pipe in land and offshore oil and gas drilling operations.
- Methodology: The fieldwork was to be spread in 2 phases. The team had to host a Phone-to-Web survey to conduct the interviews.
-
Number of Interviews:
- Phase I: 180 (30 minutes each)
- Phase II: 130 (30 minutes each)
- Target Region: USA
- Target Respondents: Drilling Engineers
- Next Generation Industrial Pump Study
- Scope: The Client wanted to better understand progressive cavity pump technology and future applications.
- Methodology: The team had to host a Phone-to-Web survey to conduct the interviews.
- Number of Interviews: 150 (15 minutes each)
- Target Region: Australia, China, France, Germany, Spain, UK and USA
- Target Respondents: Progressive cavity pump distributors/owners/engineers/specifiers/OEMs/contractors/re-sellers
- Large Diameter Conductor & Surface Casing Systems Study
- Scope: The Client wanted to gather insight to advance and improve various technologies in the area of large diameter conductor and surface casing systems (i.e., casing plus connector) used in offshore oil and gas drilling operations.
- Methodology: The team had to host a Phone-to-Web survey to conduct the interviews.
- Number of Interviews: 170 (15 minutes each)
- Target Region: Gulf of Mexico, North Sea, West Africa, South America, Caspian, Offshore Middle East, Onshore Middle East, Offshore Canada and Asia Pacific
- Target Respondents: Drillers, Project Managers, Drilling Engineers and Technical Advisory/Subject Matter Experts
- Wireline Plug and Perf Operations Study
- Scope: The Client wanted to better understand the wireline plug and perf operations market.
- Methodology: The team had to host a Phone-to-Web survey to conduct the interviews.
- Number of Interviews: 150 (30 minutes each)
- Target Region: USA
- Target Respondents: Field Operators, Technical Managers and Operation Managers
- Wind Turbines Study
- Scope: The Client wanted to better understand how to advance and improve wind turbine technologies.
- Methodology: The team had to host a Phone-to-Web survey to conduct the interviews.
- Number of Interviews: 150 (30 minutes each)
- Target Region: China, Europe, India, North America and South America
- Target Respondents: Wind Farm Operators, Wind Farm Asset Owners, Service/Repair Providers (OEM or Independent) and Turbine Manufacturer OEMs (new build)
- Geothermal Well Study
- Scope: The Client wanted to gather inputs from Geothermal Engineers as they design a geothermal well to produce electricity for a power plant.
- Methodology: The fieldwork was to be spread in 2 phases. In Phase I, the team was required to recruit the target audience for telephonic in-depth interviews. In Phase II, the team had to host a Phone-to-Web survey to conduct the interviews.
-
Number of Interviews:
- Phase I: 8 (60 minutes each)
- Phase II: 120 (30 minutes each)
- Target Region: Canada, New Zealand and USA
- Target Respondents: Geothermal Engineers
- Oilfield Tubular Inspection Market Study
- Scope: The Client wanted to gather insights into the inspection of oil and gas tubulars used in drilling, completion or production operations. (i.e. casing, tubing, drill pipe, etc.).
- Methodology: The team had to host a Phone-to-Web survey to conduct the interviews.
- Number of Interviews: 200 (30 minutes each)
- Target Region: Canada, USA, Mexico, Argentina, Brazil, Netherlands, Norway, UK, Kuwait, Saudi Arabia and United Arab Emirates
- Target Respondents: Wellsite Managers, Drilling Engineers, Field Engineers and Completions Engineers